DAM AND INFLOWS SUMMARY – FRIDAY, 15 JANUARY 2021.

Dam Operating Percentage % full Volume (m3) Usable Volume (m3)
Insiza Mayfair Y 55.10 93,862,109 86,922,469
Inyankuni Y 48.28 39,003,050 35,771,810
Lower Ncema Y 21.69 3,956,200 3,226,692
Umzingwane Y 22.58 10,085,800 8,299,260
Upper Ncema Y 38.83 17,560,700 15,742,360
Mtshabezi Y 33.69 17,516,800 15,436,960
Totals Operational Dams 43.89 181,984,659 165,399,551

INFLOWS PERIOD FROM WEDNESDAY, 13.01.2021 TO FRIDAY MORNING, 15 .01.2021.

Dam Cumulative % Cumulative Actual From 29.11.20 to 15.1.2021 Inflows 13.1.2021 Inflows 14.1.2021 Inflows 12.1.2021
Insiza 30.22 52,433,633.10 495,880.95 497,042.80 248,521.40
Inyankuni 9.28 7,500,470.00 80,400.00 80,400 283,000.00
L/Ncema 14.21 2,590,930.00 0 0 16,020.00
Umzingwane 16.36 7,305,160.00 70,800.00 17,700.00 17,700.00
U/Ncema 33.68 15,309,550.00 2,616,000.00 214,900.00 215,000.00
Mtshabezi 11.17 5,805,400.00 0 0 578,800.00
Total 21.93 90.945,143,10 3,263,080.95 810,042.80 1,359,041.40

The three supply Dams previously decommissioned have been recommissioned. However, water supply to residents is still constrained. The New Flowserve pumps which are replacing the obsolete KSB Pumps have been installed at Ncema and Fernhill Pump Stations and are still undergoing the technical commissioning. Council is working flat out with the Contractor to ensure that pumps are fully operational as soon as possible. The Water shedding schedule will be reviewed at the end of January 2021.

NB. Global % increase (∆) to date due to the recent rains is 21.93 of overall dam capacity.

Advert Number:

S ZHOU ACTING TOWN CLERK

Date: Friday, 15 January 2021

SITE MENU
  • Call Centre Contacts:
  • (09) 71290 - All Networks
  • callcentre@citybyo.co.zw
  • Fire and Ambulance:
  • 993, 994 , (09) 71717
  • 08080081 - Econ toll free